Friday, June 22, 2012

Exterior Finishes

There was a lot of work done this week waterproofing and trimming out the east wall (Carr St. side), and trimming finishing the siding and trimming out the North wall (30th St. side) is right behind.
6/22/12 - Siding being installed on front of building (30th St. side)
Installation of the roof drains and connection to the storm sewer was also completed this week, and next week some of the sidewalk that was removed to accommodate the roof drains will be poured.

6/18/12 - Drainage from roof drains to storm sewer between Program Center and Slavonian Hall

The sheetrock has all been hung, taped and mudded and next week (week of 6/25) the painters will start to do their thing starting on the second floor and moving downward.
6/18/12 - Sheetrock installed and mudded

No comments: